Excerpt of References

 

Deutsche Bahn Cottbus A 1.4 MW two boiler heat producer center for a train repair facility totally dropped out in August. The KET could help with planning, disassembly, assembly and commissioning a complete new two boiler plant incl control and chimney plant in just 20 days in September 2013.
BMW Plant Leipzig
Acidic flush
Modification and customization piping system for flushing with acid sulfur in several circuits for internal cleaning of pipelines of phosphate sludge
BMW Plant Regensburg
Acidic flush
Modification and customization piping system for flushing with acid sulfur in several circuits for internal cleaning of pipelines of phosphate sludge
BMW Plant Leipzig
dry scrubber Repainting
Modification of air filtering of wet deposition on dry deposition by retrofitting of soil sinks in the paint booths for the installation of dry filters
BMW Plant Leipzig
RNV Heat recovery
Integration of a heat recovery system in the exhaust air cleaning plant (regenerative post-combustion system) to the use of waste heat for the primary air preheating of the process plants
Optipack Leppersdorf Sprinkler system
Dauerbackwaren Wurzen CHP plant with 400 KW electrical power output and 450 KW thermal power output, including construction work, link to district heating, electrical equipment, and C&I
Energiewerke Nord GmbH
Lubmin / Greifswald
 
Energy efficiency measures at two 25 t/h high pressure steam generators which require monitoring,
configuration of new components such as modulating gas burner and flue gas heat recovery,
including renewal of automation technology for boiler and combustion
Municipal Utilities Merseburg
Heating Plant Markwardstr.
Cogeneration Plant with 2 MW electrical power output and 2.3 MW thermal power output
two heat storage tanks with 100m³ each
steel construction, prefabrication of modul and pipe components,
installation and commissioning
Municipal Utilities Merseburg
Heating Plant Ikarusstr.
9 MW boiler
cogeneration plant with 2 MW electrical power output and 2.3 MW thermal power output
two heat storage tanks with 100m³ each
prefabrication of modules and pipe components,
complete service including steel construction and commissioning
Helmholtz Centre registered association Dresden-Rossendorf e.V.
Heating Plant
Two boilers, each with 3.9 MW
one CHP plant with 625 KW electrical power output, 730 KW thermal power output
one CHP plant with 1,130 KW elektrical power output, 110 KW thermal power output, including heat storage tank, C&I and computing technology
Helmholtz Centre registered association Dresden-Rossendorf e.V. Extention of Secondary Circuits ELBE within the overall project Extention of Cooling Water distribution ELBE
Municipal Utilities Reichenbach
Heating Plant (technical general contractor)
Three boilers each with 3.5 MW
one CHP plant with 800 KW electrical power output and 874 KW thermal power output
one CHP plant 50 KW electrical power output and 80 KW thermal power output
two heat storage tanks with 25m³ each
energy source biogas and natural gas firing (both primary and/or secondary), chimney installation, electric equipment, C&I and construction work
Municipal Utilities Borna GmbH
Heating Plant (technical general contractor)
CHP plant with 400 KW electrical power output and 450 KW thermal power output,
including construction work, link to district heating, electrical equipment, and C&I
» Download article in "LVZ" January 10th 2013
Leisure and Adventure Bath "Platsch" in Oschatz
Heating Plant
Complex heat supply including one CHP plant with 216 KW electrical power output and 360 KW thermal power output and one CHP plant with 125 KW electrical power output and 229 KW thermal power output, one condensing boiler with 750KW (prefabrication of pipe components)
Porsche Modular Plant 1 Leipzig
Complex Supply Technology
Sanitary facilities
prefabrication of pipe components
installation and commissioning
Porsche Modular Plant 2 Leipzig
Complex Supply Technology
 
Heating / cooling / sanitary facilities (prefabrication of modules)
prefabrication of pipe components
installation and commissioning
Porsche Plant Extention Macan
Energy Centres
Compressed air / heating / cooling / sanitary facilities (prefabrication of modules)
prefabrication of pipe components
installation and commissioning
BMW Plant Leipzig
Body Shop
Complex Supply Technology
heating / cooling / sanitary facilities (prefabrication of modules)
BMW Plant Leipzig Press Shop
Complex Supply Technology
3D planning of supply modules heating / cooling
Prefabrication of modules and pipe components
Installation and commissioning
BMW Plant Leipzig
Heat Supply Station Modified to a Heating Plant
Expansion of heat supply station with a CHP faciltiy with 3.047 KW electrical power output and 3.013 KW thermal power output
prefabrication of pipe components
installation and commissioning
EnviaTherm Zeitz Two high pressure boilers with economiser
chemical and thermal water treatment, overall output 36 t/h
15 bar permissible pressure, 200°C steam temperature
installation and commissioning
Disposal Company Zwickauer Entsorgungsgesellschaft
Sprinkler System
Planing, developing, and commissioning of a complete sprinkler system for a storage hall totaling 1.000m²
Power Station Moorburg, Hamburg
Pipe Components Fabrication
Prefabrication of pipe components subject to surveilance for complete side boiler facility as required by power station standards Vattenfall (DN500 to DN15) appr. 105 construction groups (fault-free acceptance by TÜV and QM engineers from Vattenfall)
AMD FAB 30 and 36/CUB, Level 2
Dresden
Cooling and Heating Centre, using CAD/CAM
Aircraft Factory EADS Elbe Flugzeugwerke
Dresden
Complete heating, ventilation, plumbing technologiy, including pressurized air for a new hangar A380
WELTEC BIOPOWER GmbH
Biogas Heating Unit and Distribution Facility Könnern
3 MW boiler as a complete service, including facility construction and C&I
(container construction)
WELTEC BIOPOWER GmbH
Redevelopment of a Biogas-Heat Distribution System on Modular Construction Barsikow
810 KW heat distribution module as a complete service, including facility construction and C&I
(container construction)
WELTEC BIOPOWER GmbH
Energy Producing Facility and Distribution Systen in Modular Construction Arneburg
1,2 MW boiler and heat distribution module as a complete service, including facility construction and C&I
(container construction)
Consumer Market Portitz in Leipzig Sprinkler System and Supply Technology
(planing, realization, commissioning, and acceptance)
Zoo Leipzig Sprinkler System Congress Hall
Multipurpose Hall Neukieritzsch Sprinkler System (planing and realization)
Consumer Market Marktkauf in Oschatz Sprinkler System (planing and realization)
Paper Factory StoraEnso Eilenburg Modernisation of Sprinkler Piping 1, 1st and 2nd Construction Phase
Disposal Company Entsorgungsgesellschaften des Zwickauer Land (EGZ), Reinsdorf Water Spray System Cold Halls (planing and realization)
Disposal Company Entsorgungsgesellschaften des Zwickauer Land (EGZ), Reinsdorf Water Spray System with Water Storage Tank of appr. 300 m³ und 9 water spray groups
(planing and realization)
 
 

 

Recommendation

Sie haben den Auftrag in einer sehr kurzen Zeit ausgeführt.
Die Anlage wurde in einem Fehlerfreien Zustand übergeben.
Sehr gute Ausführung der Leistung.

alles lesen

Deutsche Bahn Cottbus

Wir bedanken uns bei der Firma Ket für die geistete , engagieret Arbeit und sind bereit die Firma Ket für anspruchsvolle Projekte weiter zu empfehlen.

alles lesen

Dr. Ing. h.c. F. Porsche Aktiengesellschaft

Die Zusammenarbeit am Werk war stets außerordentlich konstruktiv und vorbildlich . Der Auftrag wurde von der Firma KET zu unserer vollsten Zufriedenheit realisiert.

alles lesen

Helmholtz Zentrum Dresden Rossendorf